Planning for Gunn Point Peninsula

Share on Facebook Share on Twitter Share on Linkedin Email this link

Consultation has concluded

photo

The sealing of Gunn Point Road and investigations into land capability and groundwater availability have prompted a review of the land use structure identified by the Litchfield Subregional Land Use Plan over the Gunn Point peninsula, including the future Murrumujuk Township.

The Litchfield Subregional Land Use Plan (LSLUP) is a long-term plan that provides for urban growth in key locations, supports rural land uses and protects environmental assets within the Litchfield subregion.

The LSLUP builds on the overarching direction provided by the Darwin Regional Land Use Plan (2015) to guide the future development of Darwin. Planning for the future of Darwin is informed by population and infrastructure studies with stakeholder and community feedback being a key influence.

Regional and subregional land use planning provides an opportunity for authorities like Power and Water Corporation to plan for future infrastructure services such as power, water and sewerage for the medium to far term.

The Department of Environment and Natural Resources (DENR) recently completed a comprehensive study to assess and map the biophysical resources of the Gunn Point peninsula under the Mapping the Future program.

The Mapping the Future – Gunn Point assessment focused on:

  • soil and land capability;
  • identification and distribution of biodiversity assets; and
  • groundwater availability.

The proposed updates to the LSLUP respond to land capability and limited groundwater availability by proposing a reconfiguration of some land uses and outlining the conditions for developing land.

The proposed amendment to the LSLUP includes a land use concept for the future township of Murrumujuk and draft planning principles to guide future development opportunities. This includes the development of the Murrumujuk Township being contingent upon the provision of reticulated services (town water) and in conjunction with the development of strategic industry and a deep water port at Glyde Point.

The Northern Territory Planning Commission has now completed the second stage of consultation on the proposed updated to the Litchfield Subregional Land Use Plan.

Stage Two consultation, which closed on Friday 28 August 2020, was an opportunity to seek comments from the community on the proposed reconfiguration of previously identified land uses across the peninsula. Feedback received can be found in the Stage Two Consultation Snapshot and Stage Two Consultation Report.

The sealing of Gunn Point Road and investigations into land capability and groundwater availability have prompted a review of the land use structure identified by the Litchfield Subregional Land Use Plan over the Gunn Point peninsula, including the future Murrumujuk Township.

The Litchfield Subregional Land Use Plan (LSLUP) is a long-term plan that provides for urban growth in key locations, supports rural land uses and protects environmental assets within the Litchfield subregion.

The LSLUP builds on the overarching direction provided by the Darwin Regional Land Use Plan (2015) to guide the future development of Darwin. Planning for the future of Darwin is informed by population and infrastructure studies with stakeholder and community feedback being a key influence.

Regional and subregional land use planning provides an opportunity for authorities like Power and Water Corporation to plan for future infrastructure services such as power, water and sewerage for the medium to far term.

The Department of Environment and Natural Resources (DENR) recently completed a comprehensive study to assess and map the biophysical resources of the Gunn Point peninsula under the Mapping the Future program.

The Mapping the Future – Gunn Point assessment focused on:

  • soil and land capability;
  • identification and distribution of biodiversity assets; and
  • groundwater availability.

The proposed updates to the LSLUP respond to land capability and limited groundwater availability by proposing a reconfiguration of some land uses and outlining the conditions for developing land.

The proposed amendment to the LSLUP includes a land use concept for the future township of Murrumujuk and draft planning principles to guide future development opportunities. This includes the development of the Murrumujuk Township being contingent upon the provision of reticulated services (town water) and in conjunction with the development of strategic industry and a deep water port at Glyde Point.

The Northern Territory Planning Commission has now completed the second stage of consultation on the proposed updated to the Litchfield Subregional Land Use Plan.

Stage Two consultation, which closed on Friday 28 August 2020, was an opportunity to seek comments from the community on the proposed reconfiguration of previously identified land uses across the peninsula. Feedback received can be found in the Stage Two Consultation Snapshot and Stage Two Consultation Report.

Share on Facebook Share on Twitter Share on Linkedin Email this link

Drop a Pin

over 3 years

Please drop a pin on the map and tell us why this location is important to you.

CLOSED: This map consultation has concluded.