The Katherine Flood Mitigation Advisory Committee was formed in 2015 to recommend flood mitigation measures to minimise the impact of flooding in Katherine.

The $25 million Katherine Flood Mitigation Project has been progressing and several of the committee’s recommendations have been implemented, including:

  • land use planning measures, including assessing and planning for a neighbourhood commercial centre in Katherine East
  • building a new ambulance centre in Katherine East
  • constructing headworks associated with the new ambulance centre
  • flood resilience measures to support improved whole of town flood preparedness and the coordinated response and recovery.

A hydraulic flood model was created to test different options and the viability of levee banks, detention basins and drainage upgrades.

Preliminary flood modelling has identified that a combination of levee banks along the Lockheed drain from Auster Street to Stuart Highway and along the eastern side of the Victoria Highway as well as upgraded drainage will provide the greatest reduction in flood impact for a smaller flood event.

The levee design proposed will include a combination of earth embankment, concrete wall and temporary levee for road crossings.

We would like your comments on the proposed structural mitigation measure.

Click on the map to make your comments.

For a chance to win an Apple Watch, fill in the survey or send in a submission.

Competition will be drawn on Thursday 6 September 2018. The first entry drawn will win an Apple Watch valued at $599. The winner will be notified by email or phone and published in the Katherine Times on Wednesday 12 September 2018.

The Katherine Flood Mitigation Advisory Committee was formed in 2015 to recommend flood mitigation measures to minimise the impact of flooding in Katherine.

The $25 million Katherine Flood Mitigation Project has been progressing and several of the committee’s recommendations have been implemented, including:

  • land use planning measures, including assessing and planning for a neighbourhood commercial centre in Katherine East
  • building a new ambulance centre in Katherine East
  • constructing headworks associated with the new ambulance centre
  • flood resilience measures to support improved whole of town flood preparedness and the coordinated response and recovery.

A hydraulic flood model was created to test different options and the viability of levee banks, detention basins and drainage upgrades.

Preliminary flood modelling has identified that a combination of levee banks along the Lockheed drain from Auster Street to Stuart Highway and along the eastern side of the Victoria Highway as well as upgraded drainage will provide the greatest reduction in flood impact for a smaller flood event.

The levee design proposed will include a combination of earth embankment, concrete wall and temporary levee for road crossings.

We would like your comments on the proposed structural mitigation measure.

Click on the map to make your comments.

For a chance to win an Apple Watch, fill in the survey or send in a submission.

Competition will be drawn on Thursday 6 September 2018. The first entry drawn will win an Apple Watch valued at $599. The winner will be notified by email or phone and published in the Katherine Times on Wednesday 12 September 2018.

  • CLOSED: This survey has concluded.


    Consultation has concluded
    Share Structural mitigation measure survey on Facebook Share Structural mitigation measure survey on Twitter Share Structural mitigation measure survey on Linkedin Email Structural mitigation measure survey link